Services
Build the structure. Coordinate the file.
Construction
Residential and small commercial execution with stage-wise checks — structure, masonry, finishes and services coordination.
Building liaison
Approval coordination across land, building, water, electricity and environmental files — documents, submission, follow-up, tracking.
Planning
Site study, feasibility note, design coordination and an itemised estimate with assumptions and exclusions stated before work begins.
Project support
Authority coordination through completion: inspections, OC file, and permanent utility connections handed over with documents.
Bengaluru
What we coordinate. Who issues.
Land approvals
The paper the rest of the project stands on.
We coordinate
- Land-use verification and change of land use (CLU), where applicable
- DC conversion / land conversion, where applicable
- Layout approval and property-record verification
- Khata / e-Khata and property records
Issued by. Revenue authorities, planning authority and municipal records office for your jurisdiction.
Building approvals
Permission to build what you drew — and to occupy it after.
We coordinate
- Building plan sanction and revised plan approval, if required
- BDA coordination where the layout falls under BDA jurisdiction
- BBMP / relevant local planning or municipal authority, depending on jurisdiction
- Commencement Certificate (CC) and Occupancy Certificate (OC), where applicable
Issued by. BDA or BBMP / the competent local planning authority — sanction and timelines are theirs, not ours.
Water approvals
Legal water before construction water.
We coordinate
- Borewell drilling permission and applicable local requirements
- Karnataka Ground Water Authority — groundwater withdrawal NOC / borewell registration, as applicable
- Groundwater extraction and usage compliance
- Water availability assessment for the project
- BWSSB new water connection, underground drainage (UGD) and sanitary connection
- Rainwater harvesting (RWH) compliance and STP / reuse requirements for applicable projects
Issued by. Karnataka Ground Water Authority and BWSSB for their respective connections and NOCs.
Electricity approvals
Power for the site first, power for the building after.
We coordinate
- BESCOM temporary construction power connection
- BESCOM permanent LT / HT connection, as applicable
- Load sanction and load enhancement
- Transformer and electrical infrastructure approvals, where required
- Electrical safety inspection / statutory clearances, where applicable
- Solar rooftop approvals, if included in the project
Issued by. BESCOM as the distribution utility for Bengaluru; KPTCL only for transmission-level coordination, if ever needed.
Environmental approvals
Required for some projects, irrelevant for others — stated honestly either way.
We coordinate
- Karnataka Fire and Emergency Services NOC
- Karnataka State Pollution Control Board (KSPCB)
- State Environment Impact Assessment Authority (SEIAA), where applicable
- Sewage Treatment Plant (STP) approval / compliance and treated-wastewater reuse, where applicable
- Tree authority / tree-felling permission, where applicable
Issued by. Each issuing department for its own clearance; applicability depends on height, built-up area, occupancy and plot size.
Project completion
The last 5% of paperwork that decides whether the building is usable on record.
We coordinate
- Final inspections and occupancy certification file
- OC coordination with the sanctioning authority
- Permanent water and electricity connections on completion
- Lift and electrical safety compliance, where applicable
- Traffic, road access and infrastructure clearances, where required
Issued by. The sanctioning authority and the respective utility or department.
Liaison services
What we actually do, day to day, on every item above.
We coordinate
- Document preparation and file compilation
- Application submission and acknowledgement tracking
- Follow-ups and query responses with the dealing office
- Manually updated status tracking with application references
Issued by. Status shown to you is updated by our staff from office visits and portal checks — we do not claim direct access to government systems.
KEB is an older name for Karnataka's electricity board. In Bengaluru the distribution utility is BESCOM. Other clearances — aviation height, traffic, lift safety — appear in your path only when the plot actually triggers them.
Source
Official department portals
- Open portal
BDA — Ease of Doing Business
Bangalore Development Authority approvals information.
- Open portal
BBMP — Building Plan
Municipal building-plan sanction information.
- Open portal
Karnataka Ground Water Authority — registration
Groundwater withdrawal NOC / borewell registration.
- Open portal
BESCOM
New connections, load sanction, HT / LT services.
- Open portal
BWSSB — Jaladhare consumer portal
Water supply and sewerage consumer services.
Money
Government fees are not our fees
Paid to authorities
- Plan sanction fees, deposits, betterment-type charges
- Water, drainage and sanitary connection charges
- Electricity connection and load charges
- Borewell / groundwater and tree-permission charges
Paid to Build & Rise
- Document preparation and drawing coordination
- Application submission and tracking
- Follow-ups, query responses, status reporting
Stated as its own written figure — never bundled inside a construction rate.
Which approvals does your project need?
Six questions. A first-indication checklist — not a legal determination.
Ask
Approvals, answered plainly
Do you guarantee that an approval will come through?
No — and no liaison agent honestly can. Sanctions, NOCs and connections are issued by authorities on their timelines. Our responsibility is the file: correct drawings, complete documents, submitted applications, answered queries, and openly tracked status.
Which approvals apply to my plot?
It depends on jurisdiction (BDA layout, BBMP or other local authority), land record, building height, built-up area, occupancy and water source. Use the approval checklist on this page for a first indication, then confirm the exact list with the competent authority before spending on drawings.
What is the difference between government fees and your charges?
Government fees, deposits and connection charges are set by authorities, change from time to time, and are paid to them — they sit outside construction estimates. Our liaison charge covers document preparation, submission, follow-ups and tracking, and is stated in writing before work begins.
We already started construction. Can you regularise it?
Bring your existing sanctions, notices and drawings to a first discussion. We will tell you plainly what is regularisable through revised plans or completion files and what is not — some deviations cannot be fixed on paper.
Do you work outside Bengaluru?
Currently we serve Bengaluru only. Approval names, portals and procedures in the lists above are Bengaluru-specific.
This page is a planning checklist, not a legal determination. Status on this site is updated by staff. Applications live on official portals.